Friday 21 October 2011

Organising Activities

To ensure that our opening sequence is done promptly; we will have to certify that we have all the costumes, props, equipment and the actors we need. In order to do this, we will make a prop list and tick off everything that we have completed. 
The prop list will consist of all the names of the people in our group, the costumes we need (fake blood, knife, mask, bag, farmer costume, school uniform) and the equipment we need (camera, tripod, storyboard, battery, cassette).
We discussed how we will manage to complete the opening sequence within the time period we have been set. We will do a certain amount each day accordingly and we hope to to achieve our aim.
If we do it after school timings we have to ensure that it is at a time and date that everyone, who are part of our production, are avail to us, even if that person may not be needed. This is so everyone equally takes part in the making of it. Most of our filming will be produced in Repton Park, thus, either we will all make a meeting point or we will go there together - ensuring we are aware that we're constantly being pushed for time. Due to this, we all have to work together as a group to produce the opening sequence to the best of our ability.

No comments:

Post a Comment